energy audits + renewable energy

 

MC DONALDS OUTLET
Location: MULUND, MUMBAI
Timeline: COMPLETED

 

ENERGY AUDIT AND CONSERVATION MEASURES

The project involved performing a detailed energy audit of the restaurant with a focus on the HVAC systems and exterior façade. Recommendations included pre-cooling of outside air to reduce HVAC load, insulation of bare suction lines and window glazing. Implementation of these measures results in 13 % reduction of baseline energy use at the site.

 
«BACK